CCBDCraftsman Curtains & Bespoke Design

Established 2003 · Sydney

Free Quote

CCBD Project Partners · Sydney

Curtains, Blinds & Shutters for Sydney Builders

Reviewed by CCBD Project Team · Last updated 8 November 2026

CCBD (Craftsman Curtains & Bespoke Design) quotes curtains, Roman blinds, blockout, roller blinds and PVC shutters for Sydney builders from plans or a window schedule, check-measures on site and installs to your handover date. Each job is priced individually, with a dedicated contact replying within two business days.

Full-height curtains beside a wide sliding door in a new-build living room

At a glance

Key facts

TopicCCBD Project Partners
QuotationFrom plans or a window schedule
MeasureSite check before manufacture
Lead timesRoller blinds 2–3 weeks (express within 1 week) · PVC shutters 2–4 weeks · blockout curtains from about 2 weeks · curtains and Roman blinds 4–6 weeks
ContactA dedicated contact replies within 2 business days
ValueFast delivery and outstanding value through our supply network across Australia, Asia and Europe
Warranty5 years

What do builders need to send for a curtain and blind quote?

ItemNotes
Plans or window scheduleWindow sizes, room names and heights
Ceiling and bulkhead detailsRecesses, pelmets and ceiling tracks
Power for motorisationLocation of outlets if motorised
Product per roomOr ask us to recommend
Handover dateSo manufacture and installation can be scheduled

Planning window furnishings early saves rework

Decide curtain recesses, ceiling track positions and motor power before plaster and electrical work are finished. Early coordination avoids later changes to the built opening.

Installation scheduled to your handover

We confirm dates against your program and complete a site check measure before manufacture. Express roller blinds within 1 week may be available when the timeline is tight, subject to the selected system and site conditions.

Project planning

Usual lead times

ProductUsual lead time
Curtains & Roman blinds4–6 weeks
Blockout curtainsFrom about 2 weeks
Roller blinds2–3 weeks · express within 1 week available
PVC shutters2–4 weeks

Lead times are from order confirmation and depend on fabric availability and site conditions.

From brief to handover

How does a CCBD project work?

StepWhat happensTiming
1. RegisterSend plans, a window schedule or photos—
2. Scope & pricingDedicated contact confirms scope and project pricingWithin 2 business days
3. Samples & approvalFabrics at our Alexandria studio or sent to you; specification signed offAs agreed
4. MakeMade to the approved specification after a site check measureSee lead times
5. Install & handoverInstalled by our team; after hours or weekends where requiredScheduled to your program

Project questions

Frequently asked questions

Can you quote from plans?

Yes. CCBD can start a builder quotation from architectural plans or a window schedule, with room names, opening sizes and the intended treatment for each window. Before manufacture, our team checks the built openings on site. The final specification then accounts for fixing surfaces, clearances and any changes made during construction.

When should window furnishings be decided in a build?

Decide the treatment, track position, curtain recess and motor power while ceiling, joinery and electrical details can still be coordinated. That does not mean final manufacturing sizes are taken from the plan. CCBD completes a site check measure later, once the relevant surfaces are ready, before the approved specification is made.

Can you meet a tight handover?

Express roller blinds within 1 week may be available for a suitable selected system, while usual roller blind timing is 2–3 weeks. Blockout curtains are available from about 2 weeks, PVC shutters take 2–4 weeks, and curtains and Roman blinds usually take 4–6 weeks. Confirm the handover date, fabric availability and site readiness early.

Do you supply and install shutters?

Yes. CCBD can quote and install PVC shutters as part of a builder window-furnishing schedule. Their usual lead time is 2–4 weeks from order confirmation, subject to the selected system and site conditions. We check the actual openings before manufacture and coordinate installation against your handover program.

How is builder pricing set?

Each builder job is quoted individually for its products, number of windows, selected fabrics or systems, hardware and installation conditions. A dedicated contact replies within two business days to review the scope and next steps. Send plans, a window schedule and the handover program so the initial quotation is tied to the real project.

Who coordinates the site measure and installation?

CCBD completes a site check measure before manufacture and installs the finished treatments with its own team. Your project contact coordinates access and timing with the builder. A written specification schedule records the product and relevant fixing details for each window, so the team can work from the approved scope at handover.

Bring us your project brief.

About CCBD: CCBD has designed, made and installed window furnishings for Sydney homes and projects since 2003.